PROJECTS

BOP DHB Theatre Control

Client: Pope Electrical

 

Description:

The Tauranga Hospital required an upgrade and integration into the existing mechanical controls on site, Pope Elelctrical and Honeywell took care of the design details, our part was to fit all the equipment into an existing cupboard. Whilst certainly a tight fit, the board turned out to be a great example of the capability of the staff here at KCS to think ahead and do the best we can to accomodate the contractor fitting off on site.

 
 

At KCS Switchboards Ltd, we pride ourselves on 100% client satisfaction. If you need anything switchboard related, we can help.