The Paeroa and Waihi Water Treatment Plants upgrade consisted of a main board for both sites and another small DB with PLC controls for one of them.
KCS also supplied the generator connection points and small DB’s for local power and lighting.
The MSB’s consisted of manual generator changeover with a type tested BUS system and Form3 distribution. Some of the cells contained motor starters with instruments and door mounted equipment as is usual for these types of jobs. The BUS systems in the boards was tinned to suit the environment and specifications.