KCS was asked to assist with the design and manufacture of a new MCC for a Waste water treatment plant in the lower Nth Island. The MCC supplies 3 x 600kW pumps each supplied through an individual 750kVA transformer. The design needed to provide source changeover between mains supply and the standby generator which required some interesting BUS design.
Fully Type Tested Switchboard Solution using Cubic Metalwork, IP54, Form 3BIH, 50kA Fault Rating